For data centre builders & critical environment contractors

Don't Let Construction Dust Fail Your Cleanliness Sign-Off

Shell-and-core cutting, drilling and floor works throw silica and fine particulate straight into spaces that have to pass an ISO 14644-1 cleanliness test before handover. We survey your build, design the control measures and supply the equipment that keeps your programme — and your data halls — clean.

  • Free on-site dust survey, with a written control plan you can attach to your RAMS
  • Control at source, in the air and at the white-space boundary — on one supply agreement
  • Particulate monitoring and records that stand up to a cleanliness audit or HSE inspection
ISO 9001 certified
1000+ verified reviews
30+ countries supplied
60 min average reply time
Book a free site dust survey
No cost, no obligation — a specialist attends your site.
No obligation, no equipment pitch on the call. Or speak to an expert now on 0800 980 0105.
Working with the contractors and operators who can't afford a failed cleanliness sign-off
The problem

Dust Is the Risk Your Build Programme Doesn't See Until Commissioning

Cutting, drilling and grinding through concrete, blockwork and raised-floor tiles releases respirable crystalline silica — a health risk HSE inspectors look for on any live construction site. In a data centre build it carries a second cost: fine particulate settles in raised-floor voids, on cable containment and inside CRAC/CRAH units, exactly where a cleanliness test will find it.

On a live programme it rarely stays contained. It becomes a failed ISO 14644-1 particle count, a stop-work notice, a delayed handover to operations, or an inspection that arrives with an hourly charge attached.

Non-compliance is billed by the hour
HSE charges £183 an hour for time spent investigating dust issues, and a single dust-related prosecution has cost a UK business a £159,000 fine. Enforcement lands on the principal contractor, not the subcontractor holding the cut-off saw.
£183/hr
HSE charge for investigating dust issues
ISO 14644-1
Cleanliness standard your white space must pass
The solution

Three Points of Control on Every Build

One supplier, one specification, applied consistently from shell-and-core through fit-out to commissioning — so cleanliness isn't something you find out about at final sign-off.

On-Tool Extraction
01 — At source

On-Tool Extraction

M and H class industrial vacuums matched to your cutting, drilling and coring tools, so dust is captured at raised-floor and containment level before it becomes airborne.

Air Filtration & Scrubbing
02 — In the air

Air Filtration & Scrubbing

HEPA H14 filtration and negative pressure for enclosed fit-out works, keeping particulate out of adjacent live halls and mechanical spaces.

Containment & Particle Monitoring
03 — At the boundary

Containment & Particle Monitoring

Dust containment screens at the white-space threshold plus continuous particle monitoring that gives you dated evidence for commissioning sign-off, before the test does.

What happens next

Clear. Open. Honest.

From the first call to handover, you know exactly what happens at each stage — starting with a free site dust survey.

Talk to Us

Tell us what stage your build is at and what cleanliness or compliance target you're working to.

Site Review

We assess your build zones, adjacent live space, and current dust and containment measures.

Testing & Monitoring

We can carry out particle counts, LEV testing, face fit testing, and exposure checks against your target cleanliness class.

Specify What Works

We specify the right equipment, controls, and support for your build — simple to use, effective in practice, and built around HSE/COSHH and cleanliness compliance.

Supply & Train

We supply the equipment, train your team, and make sure everything is set up correctly before critical works begin.

Stay Protected

We support you with servicing, reporting, testing, and ongoing monitoring through to handover and beyond.

Proven on Critical Data Centre Builds

Mobile, low-dust systems chosen for quick installation and minimal disruption to live space and programme.

Fit-out contractor

Tier 1 Data Hall Fit-Out

Dust control systems delivered to protect adjacent live halls, meet cleanliness targets and maintain productivity.

Colocation operator

Multi-Phase Campus Expansion

Tailored solutions delivered against strict cleanliness and safety standards while phases stayed live and operational.

Hyperscale build

Shell-and-Core to Commissioning

Low-dust systems for strict commissioning demands, improving efficiency, safety and cleanliness sign-off first time.

Book Your Free Site Dust Survey

Tell us where your build is and what stage it's at. We'll come and look, and you'll get a written control plan — whether or not you buy anything from us.

Your time is valuable. Our industry experts aim to reply within 60 minutes! Get in touch today and discover a safer tomorrow.

Arrange a Call
Protecting
More Than You
It can take less than an hour to find out how.